Service

Home  >  Service


Process Optimizing And Production Fabricate

Process design

3D installation design

Automatic programming

Electric design

Product manufacture

Installation & commissioning

FAQ

  • 1.When is the delivery or lead time?

    • Depending on your order: for whole production line it is 45-60 days. Other simple equipment will be around 7 days. The above lead time is calculated after receiving the down payment as well as sample bottles,tubes and materials for making the mould and testing.

  • 2. Is there a minimum quantity to place an order?

    • No, You only need to buy 1 set as minimum quantity for any machine and spare parts.

  • 3. How about the payment terms?

    • We accept TT with 30% as down payment and the balance 70% before the machine ship out. Also L/C at sight, Western Union, via Alibaba is acceptable. Bank details will be provided.

  • 4. What about the shipment packing?

    • We are using standard export packing materials - Free of Fumigation Plywood case.

  • 5. Who is going to install the equipment?

    • Generally, customers can install the machine according to our user's manual and video. If you want to visit our factory for equipment inspecting, we also can do installation training for you. of course, we also can send our engineer to your factory for commissioning. Buyer needs to pay round air tickets, hotel and service expenses.

  • 6. How about the after sales service?

    • We can provide maintenance support for any issues with the equipment for its whole life. If the equipment is still under our one-year-warranty, we will replace and repair the faulty parts free of charge and buyer will only need to pay freight. If the faulty parts are in stock, we can send out within 3 working days.